Structures & Earth Retention
The Golden Glades Interchange represents the confluence of five major roadways:
ICOP improved this crucial interchange by installing and removing approximately 76,190 square feet of temporary steel sheet piling. We also built a temporary critical wall consisting of steel soldier beams, steel wales, post-tensioned anchors, and hardwood lagging.
The soldier pile and lagging wall allowed traffic to continue flowing as construction continued on these major thoroughfares.